Lerwick office:
Constructed a 425m long access track and 1200m2 crane pad to allow the erection of an Enercon E-82 Turbine.
Completed works comprised the construction of an upgraded septic tank at the old playing fields in Brae, Shetland. Works...
Pipe collars required to sink the HPPE pipe to sea bottom and to hold in place until covered. Completed works consisted ...
The work comprised of a new hanger building together with modifications to the existing apron area, located at Scatsta ...
Supplied concrete and pump for the construction of the new pier at Dales Voe....